OUR PROJECTS
-
Sunshine Coast solar farm SCADA upgrade
-
Henty and White Spur telemetry upgrade
-
Remote tidal gate automation for environmental rehabilitation
-
Remote water storage tank management
-
Flood mitigation for Latrobe, Tasmania
-
Dundonnell wind farm
-
Owner’s Engineer for secure, climate-resilient transmission line
-
Kutehr hydropower project
-
Building renewable energy capacity in the Solomon Islands
-
Kidston Pumped Storage Hydro Project (K2-Hydro) – Owner’s Engineer
-
Nikachhu run-of-river hydropower project
-
Walcha Off-Creek Storage – A Boost to Climate Resilience
-
Ross Island Wind Energy Network
-
King Island’s Huxley Hill Wind Farm and Solar Farm
-
Mossy Marsh Dam Upgrade
-
Port Augusta Renewable Energy Park
-
Murra Warra II Wind Farm
-
An international partnership for Certified Dam Safety Inspector training
-
Bango Wind Farm
-
Hazelwood Battery
-
Frasers Solar Farm
-
ARISE: Accelerating renewable energy integration in the Maldives
-
Reimagining the Tarraleah hydropower scheme
-
Tailem Bend 2 Hybrid Project – grid connection studies
-
Portable weather and camera station for TasParks
-
Trial Harbour substation electrical clearance checks
-
Henderson Dam Upgrade
-
Visibility analysis for the proposed new Bridgewater Bridge, Tasmania
-
TasWater – Dam Safety Monitoring
-
Flows for the Future
-
Gordon Switchyard Upgrade – 3D Modelling
-
Spatial and data services support Battery of the Nation
-
Radio Frequency Desktop Modelling and Radio Link Testing
-
Improving water monitoring efficiency with Entura’s automated water telemetry system
-
Warwick Solar Farm
-
Wemen Solar Farm
-
Weather data collection for transmission line operation
-
Cattle Hill Wind Farm, Tasmania
-
CONNECTING HYDROPOWER TO THE GRID IN SOLOMON ISLANDS
-
Bulanog Batang Hydro Electric Power Plant
-
Jemalong Solar Farm
-
Granville Harbour Wind Farm, Tasmania
-
Supporting renewable energy developments in Tonga
-
Manildra Solar Farm
-
Upgrade of telemetry and dam safety monitoring at Lake Margaret, Tasmania
-
Alaoa multi-purpose dam – Samoa
-
SCADA development consultancy – Solomon Islands
-
Agnew Hybrid Renewable Project
-
Nam Pha Gnai hydropower plant, Laos
-
Tuvalu – Renewables roadmap and feasibility studies
-
Hydraulic modelling study – Huon Valley, Tasmania
-
Tasmanian pumped hydro options studies
-
Nagmati Dam, Kathmandu
-
Coober Pedy hybrid renewables project
-
Middleback pumped hydro concept study
-
Rottnest Island water and renewable energy nexus project
-
Flinders Island Hybrid Energy Hub
-
King Island Renewable Energy Integration Project
-
Pumped Hydro Atlas of Australia
-
White Rock Wind Farm
-
Longreach Solar Farm
-
Oakey Solar Farm
-
Marshall Islands hybrid renewables power system
-
Failure modes assessments for three multipurpose dams in the Philippines
-
Chanju-I run-of-river hydroelectric project
-
Kidston Pumped Storage Hydro – Feasibility Study
-
Wivenhoe pumped storage hydraulic transient study
-
Wivenhoe Power Station condition assessment
-
Cook Islands hybrid renewables power system
-
Yap hybrid renewable energy system
-
SA Water dam portfolio risk assessment
-
Cradle Mountain Water dam portfolio risk assessment
-
Meander Dam: an award-winning water management system for reliable irrigation
-
Waterloo Wind Farm – from site identification to operation
-
Woolnorth Wind Farm
-
Studland Bay Wind Farm
-
Musselroe Wind Farm – from feasibility to operation
-
Cathedral Rocks Wind Farm
-
Power system studies in Fiji
-
Supporting the automation of TransGrid’s substations
-
Sheffield Substation SCADA upgrade
-
George Town Substation automation upgrade
-
Redeveloping ageing high-voltage substations in Tasmania
-
Understanding the electromagnetic impacts of a new transmission circuit
-
Hydro Tasmania dam safety surveillance and monitoring program
-
Conglomerate Dam upgrade
-
Decommissioning two out-of-service water supply dams
-
Kiunga Power Station, PNG – 11 kV switchboard audit
-
Rowallan Dam upgrade – flood forecasting
-
Cethana Dam cavern – extensometer monitoring
-
Sovi multipurpose dam feasibility study
-
Hela hydropower project, PNG – feasibility study
-
Wellington Dam upgrade
-
Suma Park Dam upgrade, NSW
-
Mongi-Bulum hydropower project – pre-feasibility study
-
Meander Dam: designing a new RCC dam
-
Melbourne Water – mini-hydro projects
-
Catagunya Dam restoration project
-
Cascade management – Rouna hydropower scheme, PNG
-
A smart data solution to enhance hydropower operations
-
Ncondezi coal mine and power plant – bulk water study
-
Enlarged Cotter Dam – outlet works
-
Murum hydropower project – independent dam safety engineer
-
Moogerah Dam upgrade – Queensland
-
A 220 kV transmission tower footing rectification
-
AEMO’s protocol for transmission augmentation
-
Building climate resilience at Hydro Tasmania
-
Generation planning and catchment management in Fiji
-
Lower South Esk Irrigation Scheme – tender design
-
Gordon Power Station upgrade and modernisation
-
John Butters Power Station upgrade
-
Ramu 1 Power Station condition assessment and upgrade
-
Lower Mekong hydropower development – basin-wide sustainability assessment
-
Tina River environmental and social planning for sustainable hydropower
-
Trevallyn Power Station upgrade and modernisation
-
Climate Futures for Tasmania
-
Contact Energy, NZ – condition-based maintenance review
-
Due diligence for a wind-solar-battery hybrid project
-
Alaknanda and Satluj basins – river basin optimisation study
-
Hobart City Council – flood forecasting
-
Olympic Dam: managing water-use data for better mine management
-
Naoro Brown hydroelectric project
-
Wyaralong Dam design and construction
-
Tina River hydropower – phase 3 feasibility study
-
West Melbourne Terminal Station upgrade – planning permit application
-
UNE renewable energy options study
-
Condabri North, Central and South – 132 kV substations
-
Columboola and Wandoan South substations
-
Newton substation redevelopment
-
Musselroe wind farm – voltage control system
-
Upper Ringarooma irrigation scheme
-
Melbourne urban solar atlas
-
Musselroe wind farm – wind monitoring
-
International hydropower investment assessment
-
Woori Yallock and Little Yarra River catchments – metering and monitoring
-
Horizons Regional Council – flood forecasting
-
Logan River catchment early works – Cedar Grove Weir
-
Logan River catchment early works – Bromelton offstream storage
-
State Emergency Service – flood support system
-
Phata Byung – assessment of a damaged hydropower project
-
Sarawak hydropower feasibility studies
-
Kuala Lumpur’s SMART flood detection and mitigation
-
Thursday Island – wind farm feasibility study
-
Sandy Bay Rivulet – flood study
-
Candowie Reservoir – dam upgrade
-
Rouna 2 – upgrade of underground hydropower station
-
Kota 2 small hydropower investigation, feasibility and tender design
-
Preston and Thomastown pumping stations – mitigating the risks of hydraulic surges
-
Macarthur wind farm – GPS compliance assessment and R2 model validation
-
Water Smart – Integrated water management
-
TasWater – Dam portfolio risk assessment
-
Neusberg hydropower project
-
Ok Menga – rehabilitating an ageing hydro power station